Bauer Umwelt carried out an in-situ remediation using air sparging on the premises of a lighting factory in Münchwilen (CH).
Removal of underground foundations and obstacles using large-hole drilling in an area containing tannery waste suspected of being contaminated with anthrax
Demolition, soil remediation, earthwork and sheeting work
Kiel, Max-Eyth-Strasse, Christian Albrechts University of Kiel, new building for the Institute of Physiology. Creation of an excavation pit on a former household waste dump
Large-scale Constructed Wetland Design, Build, Own & Operate
Bauer Umwelt constructed a turnkey excavation pit within a beam-and-pile wall for NRM, including the disposal of 5,000 tons of excavated material.
Special foundation engineering, earthworks, process engineering, waste disposal