Frankfurt am Main, Seegewann - Excavation pit for substation 85

Bauer Umwelt constructed a turnkey excavation pit within a beam-and-pile wall for NRM, including the disposal of 5,000 tons of excavated material.
BAUER Umwelt - Excavation pit UW85
Service Provider

BAUER Resources GmbH

BAUER-Straße 1 / 86529 Schrobenhausen
Project
Location of performance / Site: Seegewann 17, Frankfurt am Main, Hesse, Germany, Europe
Period: Jan - Dec 2023
Responsible company location: BAUER Resources GmbH, Bereich Bauer Umwelt, Standort Kelsterbach
Description

Complete service for the construction of an excavation pit for the construction of a new substation:

  • 410 m² freestanding beam-pile shoring (TBV) including dismantling
  • 2,500 m³ excavated soil
  • 5,000 tonnes of disposal (recycling and disposal) LAGA Z0 to Z2
  • 25 m³ underpinning existing substation
  • 10 m³/h water retention
  • 250 m³ refilling of work areas
Earth-Moving Work & Development
Earthwork Properties
Equipment: Excavator, Wheel loaders
Earthworks: Building pit
Excavation method: Conventional with loader and excavator
Earthwork mass: 2500 m³
Tonnage: 5,000 t
Excavation depth & GOK: 4 m
Filling materials: Gravel
Fields of application: Excavations
Earth-Moving Work & Development
Shoring Work Properties
Fields of application: Civil engineering
Application areas: Mine temporary support system, Beam-plank shoring (TBV)
Shoring types: Berlin construction
Shoring area: 410 m²
Tonnage: 65 t
Earth-Moving Work & Development
Dewatering Properties
Methods: Sump pit
Type of dewatering: Open
Flow: 10 m³/h
Client

NRM Netzdienste Rhein-Main GmbH

Solmsstraße 38
60486 Frankfurt am Main
Hesse, Germany, Europe