Finished excavation pit with profiled subgrade
| Location of performance / Site: | Seegewann 17, Frankfurt am Main, Hesse, Germany, Europe |
|---|---|
| Period: | Jan - Dec 2023 |
| Responsible company location: | BAUER Resources GmbH, Bereich Bauer Umwelt, Standort Kelsterbach |
Complete service for the construction of an excavation pit for the construction of a new substation:
| Equipment: | Excavator, Wheel loaders |
|---|---|
| Earthworks: | Building pit |
| Excavation method: | Conventional with loader and excavator |
| Earthwork mass: | 2500 m³ |
| Tonnage: | 5,000 t |
| Excavation depth & GOK: | 4 m |
| Filling materials: | Gravel |
| Fields of application: | Excavations |
| Fields of application: | Civil engineering |
|---|---|
| Application areas: | Mine temporary support system, Beam-plank shoring (TBV) |
| Shoring types: | Berlin construction |
| Shoring area: | 410 m² |
| Tonnage: | 65 t |
| Methods: | Sump pit |
|---|---|
| Type of dewatering: | Open |
| Flow: | 10 m³/h |