Special foundation engineering, earthworks, process engineering, waste disposal
Removal of underground foundations and obstacles using large-hole drilling in an area containing tannery waste suspected of being contaminated with anthrax
Bauer Umwelt carried out an in-situ remediation using air sparging on the premises of a lighting factory in Münchwilen (CH).
Kiel, Max-Eyth-Strasse, Christian Albrechts University of Kiel, new building for the Institute of Physiology. Creation of an excavation pit on a former household waste dump
Large-scale Constructed Wetland Design, Build, Own & Operate
Demolition, soil remediation, earthwork and sheeting work
Demolition of the former ZV tank farm with expansion of fuel tanks and renovation through soil replacement. Disposal of the building fabric and the excavated soil. Dewatering with water purification.
Turnkey excavation pit
Bauer Umwelt constructed a turnkey excavation pit within a beam-and-pile wall for NRM, including the disposal of 5,000 tons of excavated material.
With more than 30 years of experience, the Bauer Environment Division of BAUER Resources GmbH is one of the leading remediators of contaminated sites throughout Germany.