Removal of underground foundations and obstacles using large-hole drilling in an area containing tannery waste suspected of being contaminated with anthrax
Bauer Umwelt carried out an in-situ remediation using air sparging on the premises of a lighting factory in Münchwilen (CH).
Bauer Umwelt constructed a turnkey excavation pit within a beam-and-pile wall for NRM, including the disposal of 5,000 tons of excavated material.
Special foundation engineering, earthworks, process engineering, waste disposal
Large-scale Constructed Wetland Design, Build, Own & Operate
With more than 30 years of experience, the Bauer Environment Division of BAUER Resources GmbH is one of the leading remediators of contaminated sites throughout Germany.