Turnkey excavation pit
Bauer Umwelt constructed a turnkey excavation pit within a beam-and-pile wall for NRM, including the disposal of 5,000 tons of excavated material.
Kiel, Max-Eyth-Strasse, Christian Albrechts University of Kiel, new building for the Institute of Physiology. Creation of an excavation pit on a former household waste dump
Demolition, soil remediation, earthwork and sheeting work
Demolition of the former ZV tank farm with expansion of fuel tanks and renovation through soil replacement. Disposal of the building fabric and the excavated soil. Dewatering with water purification.