Large-scale Constructed Wetland Design, Build, Own & Operate
Special foundation engineering, earthworks, process engineering, waste disposal
Bauer Umwelt carried out an in-situ remediation using air sparging on the premises of a lighting factory in Münchwilen (CH).
Turnkey excavation pit
Demolition of the former ZV tank farm with expansion of fuel tanks and renovation through soil replacement. Disposal of the building fabric and the excavated soil. Dewatering with water purification.
Kiel, Max-Eyth-Strasse, Christian Albrechts University of Kiel, new building for the Institute of Physiology. Creation of an excavation pit on a former household waste dump
Removal of underground foundations and obstacles using large-hole drilling in an area containing tannery waste suspected of being contaminated with anthrax
With more than 30 years of experience, the Bauer Environment Division of BAUER Resources GmbH is one of the leading remediators of contaminated sites throughout Germany.